Qingdao Yinghai Corrosion and Fouling Control Technology Co.,Ltd have two coal-fire power stations cathodic protection projects that JENEPONTO phase2 2×135MW and Indonesia MAMUJU2×25MW. The operation, commissioning, acceptance and handover for cathodic protection system in the power plant were all completed, then they laid the foundation for smooth operation of our company in whole year.
In these two projects, Qingdao Yinghai enforce the contract strictly, control produce quality strictly, carry out the monitoring work of equipment with clients during the process of produce. In the stage of site installation, we have sent the experienced engineering to the site for guidance, and finally completed the commissioning work of system, and passed the acceptance of clients successfully.
Because of the successful commissioning of cathodic protection in these two power stations, we won the recognition and trust of China Energy Engineering Corporation Limited and China Huadian Corporation again, and tested the technology and product strength of Yinghai design and manufacture again.
1. JENEPONTO
Site commissioning in JENEPONTO power station
2. Site commissioning in MAMUJU power station